top of page

A Quick Report on Water Abatement

13 minutes ago
1 min read

Phase two is completed. After two rainstorms, the basement is dry. We are moving forward into phase three. This will consist of a complete basement remodel.


Holley Sanders, Kevin Readnour and I met Thomas Small from Space Design. Space Design is an architectural firm that specializes in church design. The session has entered into a contract with them for preliminary drawings. Construction is expected to begin sometime after the first of next year.  


-- Lenny

Comments


First Presbyterian Church

Write Us

405.238.6667

fpcpvok@gmail.com

​

P. O. Box 506

320 N Walnut

Pauls Valley OK 73075

    Thanks for submitting!

    ©2019 by FPCPV. Proudly created with wix.com

    bottom of page